Side-by-side or stacked configurations, designed for owner-occupy plus rental or pure investment. Two fully contained, legal units on a single lot - designed around your goals, not a builder's template.
Three-unit developments sized and configured to maximize your lot's potential under current bylaws. Each unit purpose-designed for rentability, long-term maintenance, and durable tenant appeal.
The maximum density on most standard BC lots under SSMUH. Four fully legal, permitted units - designed around return on investment, not compromised to squeeze into an envelope.
Near designated transit corridors, BC zoning allows up to 6 residential units. We assess your property's eligibility, design to the full development envelope, and manage every permit and consultant.
A compact, fully independent home along your rear lane - increasingly permitted under new legislation. Fully legal, separately metered, and independently titled where applicable. A significant value-add on eligible lots.
Units designed around families, not just investors. Connected layouts with acoustic separation, independent entrances, and intentional privacy - built for the way extended families actually want to live together.
| The Traditional Approach | The Koze Way | |
|---|---|---|
| Regulatory Navigation | Owner navigates BC’s new SSMUH zoning changes alone. | We assess your lot and handle all zoning research, permit applications, and compliance. |
| Project Coordination | Separate architect, engineer, and GC – managed by the owner, often in conflict. | One design-build team managing every consultant and every trade under one contract. |
| Budget Setting | Design first, budget second – expensive scope changes are common. | Budget-first – scope and cost are aligned before design begins, not after. |
| Contract Type | Cost-plus estimates and open-ended contracts that expand during construction. | Fixed-price contract issued only after full design and permitting are complete. |
| Unit Configuration | Generic layouts adapted from standard templates. | Purpose-designed for your specific property, your investment goals, and your tenants. |
| Timeline Clarity | Unclear milestones and moving targets. | Detailed phase-by-phase schedule provided before construction begins. |
You own a lot and you're ready to put it to work. Multiple rental units generating income from a single title, all built to code and designed for long-term tenants. The math on a fourplex in the Lower Mainland - rental yields, capital appreciation, financing - has rarely been more compelling.
You've got the land. SSMUH legislation has expanded what's buildable without rezoning. We assess what's possible on your specific lot, guide you through design and permits, and deliver a fully compliant, occupied multi-unit development - on time, on budget, and to code.
Different households, one property. Whether you're housing parents, adult children, or extended family - a thoughtfully designed multi-unit configuration gives everyone real privacy and independence without the distance of separate properties. Close enough to matter, separate enough to work.
Small-Scale Multi-Unit Housing (SSMUH) refers to residential development enabled by BC’s Bill 44 (Housing Statutes Amendment Act, 2023). It allows property owners to build multiple residential units on lots previously zoned for single-family homes – without a full rezoning application. The legislation applies broadly across BC municipalities with populations over 5,000 and was designed to meaningfully increase housing supply on existing residential lots.
In most cases, no rezoning is required – that’s precisely what Bill 44 changed. Most standard lots can now accommodate up to 4 units by right. Properties within 400 metres of a frequent transit stop may permit up to 6. Smaller lots under 280 m2 may be limited to 3 units. The exact number depends on your lot size, municipality, and proximity to transit. We assess this as part of our property review.
Most standard single-family lots in Lower Mainland municipalities qualify – the legislation was designed to apply broadly. That said, site-specific factors matter: lot dimensions, existing easements, heritage designations, flood plain status, and servicing capacity can all affect what’s buildable. The most reliable answer comes from a property assessment. Tell us your address and goals – we’ll give you a straightforward picture of your options.
Same as every project we take on: budget conversation first, design second, fixed-price contract before construction begins. We handle zoning assessment, architectural design through our design partners, permit applications, and full construction management – all under one contract. You’re not coordinating between an architect, a permit expediter, and a general contractor. That’s our job. We qualify projects honestly upfront – if the scope and budget don’t align, we’ll say so before you’ve invested time in the process.
The most important thing is having a realistic budget conversation before committing to design. Multi-unit projects are more complex than single-family builds – they involve separate utility connections, fire separation requirements, and more involved permit processes. We help you understand all of this upfront so you can make informed decisions before any planning dollars are spent. If the project isn’t a fit for your goals and budget, we’ll tell you that in the first conversation.